• 【国科大卜算】Moving Tables


    Moving Tables

    Problem description

    The famous ACM (Advanced Computer Maker) Company has rented a floor of a building whose shape is in the following figure.

    img

    The floor has 200 rooms each on the north side and south side along the corridor. Recently the Company made a plan to reform its system. The reform includes moving a lot of tables between rooms. Because the corridor is narrow and all the tables are big, only one table can pass through the corridor. Some plan is needed to make the moving efficient. The manager figured out the following plan: Moving a table from a room to another room can be done within 10 minutes. When moving a table from room i to room j, the part of the corridor between the front of room i and the front of room j is used. So, during each 10 minutes, several moving between two rooms not sharing the same part of the corridor will be done simultaneously. To make it clear the manager illustrated the possible cases and impossible cases of simultaneous moving.

    img

    For each room, at most one table will be either moved in or moved out. Now, the manager seeks out a method to minimize the time to move all the tables. Your job is to write a program to solve the manager’s problem.

    Input

    The input consists of T test cases. The number of test cases ) (T is given in the first line of the input file. Each test case begins with a line containing an integer N , 1 <= N <= 200, that represents the number of tables to move.
    Each of the following N lines contains two positive integers s and t, representing that a table is to move from room number s to room number t each room number appears at most once in the N lines). From the 3 + N -rd
    line, the remaining test cases are listed in the same manner as above.

    Output

    The output should contain the minimum time in minutes to complete the moving, one per line.

    Sample

    InputOutput
    3
    4
    10 20
    30 40
    50 60
    70 80
    2
    1 3
    2 200
    3
    10 100
    20 80
    30 50
    10
    20
    30

    My understand

    计算最大的重合段数,桌子移动的耗时,取决于移动路径上最大的重合次数。因为在移动这个路径上的桌子时,其他路径上的桌子可以进行移动。

    //
    // Created by Gowi on 2023/9/15.
    //
    
    #include 
    
    using namespace std;
    
    void swap(int &a,int &b){
        if (a>b){
            int temp=b;
            b=a;
            a=temp;
        }
    }
    
    int main() {
        int T;
        cin >> T;
        while (T--) {
            int N, s, t;
            int nums[210]={0},max_c=0,Ns,Nt;
            cin >> N;
            for (int i = 0; i < N; ++i) {
                cin >> s >> t;
                swap(s,t);
                Ns=(s+1)/2;
                Nt=(t+1)/2;
                for (int j = Ns; j <= Nt ; ++j) {
                    nums[j]=nums[j]+1;
                    if (nums[j]>max_c){
                        max_c=nums[j];
                    }
                }
            }
            cout<<max_c*10<<endl;
        }
    }
    
    
    • 1
    • 2
    • 3
    • 4
    • 5
    • 6
    • 7
    • 8
    • 9
    • 10
    • 11
    • 12
    • 13
    • 14
    • 15
    • 16
    • 17
    • 18
    • 19
    • 20
    • 21
    • 22
    • 23
    • 24
    • 25
    • 26
    • 27
    • 28
    • 29
    • 30
    • 31
    • 32
    • 33
    • 34
    • 35
    • 36
    • 37
    • 38
    • 39
  • 相关阅读:
    用sql server知识回答
    我和爬虫的故事
    cv2.imread无法读取图片
    学习java第五十二天
    【C++】多态 ⑦ ( 多态机制实现原理 | 虚函数表概念 | 虚函数表工作机制 | vptr 指针 | 虚函数表运行时机制 | 虚函数与动态联编 )
    【Java牛客刷题】入门篇(02)
    linux文件存储之inode,硬链接,软链接详解
    继承(三) —— 继承中的作用域(父类成员 与 子类成员同名)
    RDD算子操作(基本算子和常见算子)
    Redis深入理念学习和集群的搭建
  • 原文地址:https://blog.csdn.net/qq_43309286/article/details/133221584